The Central Utility Building (CUB) at the GlobalFoundries computer chip factory features an expansive, two-story structure that supports the HVAC systems and the treatment of chemical waste coming from the manufacturing process in the Fab building. The exterior metal panel system was installed by A. C. Dellovade.